    An analysis of the impacts of prepaid water meters in three towns in Namibia.

    Thumbnail
    View/Open
    Main article (2.413Mb)
    Date
    2016-06
    Author
    Iipinge, Kornelia N.
    Metadata
    Show full item record

    Abstract
    Namibia’s climate is hot and dry with erratic rainfall.Groundwateristhe main source of water. Namibian municipalities are responsible for drinking water delivery in urban areas. They buy bulk water from the national water utility (NamWater) and many face challenges in paying for the water. The main objective of this study was to investigate the impacts of prepaid water metering systems in three selected towns (Karibib, Swakopmund and Usakos). The specific objectives were to investigate the drivers for the installation of Prepaid Water Meters(PPWMs), to investigate stakeholder involvement and their perceptions of PPWMs. The study also analysed the impacts of PPWMs on residents in the selected towns. Individual PPWMs in Usakos Town and communal standpipes PPWMs in the three town’s informal settlements were studied. Purposive sampling method was used to identify customers that use PPWMs. Methods usedto collect data included focus group discussions, household surveys, interviews with key informants and observations. A total of 321 household questionnaires investigating household/water user perceptions on service delivery, access and reliability, affordability of water and water use changes were administered. The study found out that the PPWMs were installed to recover costs as a result of poor revenue collection efficiency, illegal water connections and high debts of the water users. The study also found out that customers were not consulted before the introduction of the PPWMs. Although most of the respondents stated that PPWMs had a number of problems, such as the availability of tokens to top up credit, the majority preferred PPWMs to postpaid meters. The study established that the PPWMs were considered unreliable and are non-functional most of the time with along cycle time for repairs between weeks to a month. The impact on the quality of life of standpipes prepaid users was said to be positive, for example, because water was perceived to be affordable and more accessible tothe PPWMs system. The impact on the quality of life of PPWMs in Usakos was found to benegative, as customers first need to pay for municipal services before they can purchase water units, high cost in replacing token or meter, no service after municipal’s working hours and limitations in water use.
    URI
    http://hdl.handle.net/10646/3407
    Additional Citation Information
    Iipinge, Kornelia N. (2016). An analysis of the impacts of prepaid water meters in three towns in Namibia. (Unpublished Masters Thesis). University of Zimbabwe, Harare.
    Sponsor
    WaterNet
    Subject
    Prepaid water meters
    Urban water supply
    Human right to water
    Stakeholder participation
    Cost recovery in water supply
    Collections
    • Faculty of Engineering & The Built Environment e-Theses Collection [137]

    Related items

    Showing items related by title, author, creator and subject.

    • Thumbnail

      Towards Community-Based Natural Resources Management In The Water Sector: An Analysis of Legislative Changes made under the South African and Zimbabwean Water Reforms 

      Chikozho, Claudious (2014-09-29)
      This paper presents a comparative review of Zimbabwe and South Africa's water Acts of 1998. The legislative changes made in both countries were not isolated events. They were part of broader reform programs aimed at changing ...
    • Thumbnail

      An analysis of the effects of the Chitungwiza urgent water supply, sanitation and rehabilitation project phase 11 on the water supply situation in Chitugwiza, 2015-2018. 

      Mhlanga, Rumbidzai (University of Zimbabwe, 2019-05)
      The study focused on analysing the effects of the Urgent Water Supply Sanitation and Rehabilitation Project (UWSSRP) Phase 2 on the water supply situation in Chiungwiza. This came amidst the realization of UWSSRP’s potential ...
    • Thumbnail

      Partitioning of Unaccounted for Water for Zomba City Water Supply System in Malawi 

      Chipwaila, Jessy Alida (2012-08-30)
      Urban water supply utilities in developing countries are faced with challenges of low service coverage and high unaccounted for water (UFW). UFW reduces the water available to customers, and results in loss of revenue ...

    University of Zimbabwe: Educating To Change Lives!
    DSpace software copyright © 2002-2020  DuraSpace | Contact Us | Send Feedback
     

     

    Browse

    All of UZ eScholarCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage StatisticsView Google Analytics Statistics

    University of Zimbabwe: Educating To Change Lives!
    DSpace software copyright © 2002-2020  DuraSpace | Contact Us | Send Feedback